ChargingAtlas

AK / Juneau

AK · EV charging

EV charging in Juneau, AK

Here is what NREL's public data shows about EV charging in Juneau, AK. As of NREL AFDC data retrieved July 2026, Juneau has 16 public charging stations with 23 Level 2 ports, including 4 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 13 stations list free charging

Stations are operated across 3 networks: Non-networked (14), TURNONGREEN (1), SYNERGEV (1).

Connectors on record: J1772 (Level 2) at 14 stations; CHAdeMO at 3 stations.

Of these stations, 13 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 3. Always confirm current pricing with the network before you charge.

Notable charging stations

The largest sites by port count, DC fast first. Juneau has 16 public stations in all — see the map above.

StationNetworkChargingConfirmed
Fred Meyer Juneau
8181 Glacier Hwy
Non-networked DC fast 2 DC fast + 2 Level 2 · CHAdeMO, J1772 (Level 2) June 2025
Downtown Transit Center
100 Main St
Non-networked DC fast 1 DC fast · CHAdeMO ⚠ June 2024
Alaskan Brewing Tap Room
5368 Commercial Blvd
Non-networked DC fast 1 DC fast · CHAdeMO June 2025
Alaska Electric Light & Power
5601 Tonsgard Ct
Non-networked 2 Level 2 · J1772 (Level 2) ⚠ July 2023
Marine Parking Garage
292 Marine Way
Non-networked 2 Level 2 · J1772 (Level 2) May 2025
Douglas Library
1016 3rd St
Non-networked 2 Level 2 · J1772 (Level 2) ⚠ July 2023
Eaglecrest Ski Area
3000 Fish Creek Rd
Non-networked 2 Level 2 · J1772 (Level 2) ⚠ June 2024
Mendenhall Valley Public Library
3025 Diamond Park Loop
Non-networked 2 Level 2 · J1772 (Level 2) ⚠ June 2024
University of Alaska Southeast
11066 Auke Lake Way
Non-networked 2 Level 2 · J1772 (Level 2) January 2026
Alaska State Library, Archives, and Museum
395 Whittier St
Non-networked 2 Level 2 · J1772 (Level 2) June 2025

⚠ 6 of Juneau's 16 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Juneau?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Juneau

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.