AL / Dothan
AL · EV charging
EV charging in Dothan, AL
Here is what NREL's public data shows about EV charging in Dothan, AL. As of NREL AFDC data retrieved July 2026, Dothan has 13 public charging stations with 12 Level 2 ports, including 24 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 13Public stations
- 12Level 2 ports
- 24DC fast ports
- 67%Ports that are DC fast
Stations are operated across 5 networks: ChargePoint Network (7), Tesla Destination (2), LOOP (2), Tesla (1), and 1 more.
Connectors on record: CCS (J1772 Combo) at 7 stations; CHAdeMO at 6 stations; J1772 (Level 2) at 5 stations; NACS / Tesla at 3 stations.
Of these stations, 2 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 11. Always confirm current pricing with the network before you charge.
3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Dothan has 13 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Dothan, AL - Tesla Supercharger 1151 Ross Clark Cir | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| Bondy's Ford 3615 Ross Clark Cir | FORD_CHARGE | DC fast 6 DC fast · CCS (J1772 Combo) | July 2026 |
| DU ELECTRIC STATION 2 207 N Saint Andrews St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| DU ELECTRIC STATION 1 207 North Saint Andrews St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| MERCEDES-FAST HYUNDAI SALES 2329 Ross Clark Cir | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| MERCEDES-FAST HYUNDAI LOT 2329 Ross Clark Cir | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| DU ELECTRIC DOC 4 407 Taylor Rd | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| DU ELECTRIC DOC 3 407 Taylor Rd | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| SpringHill Suites Dothan - Tesla Destination 4978 Montgomery Hwy | Tesla Destination | 5 Level 2 · J1772 (Level 2), NACS / Tesla | ⚠ July 2024 |
| TownePlace Suites by Marriott Dothan - Tesla Destination 201 Retail Dr | Tesla Destination | 3 Level 2 · J1772 (Level 2), NACS / Tesla | ⚠ July 2024 |
⚠ 2 of Dothan's 13 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Dothan?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Dothan
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.