AL / Dothan
AL · EV charging
EV charging in Dothan, AL
Here is what NREL's public data shows about EV charging in Dothan, AL. As of NREL AFDC data retrieved September 2026, Dothan has 11 public charging stations with 4 Level 2 ports, including 24 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 11Public stations
- 4Level 2 ports
- 24DC fast ports
- 86%Ports that are DC fast
Stations are operated across 4 networks: ChargePoint Network (7), LOOP (2), Tesla (1), FORD_CHARGE (1).
Connectors on record: CCS (J1772 Combo) at 7 stations; CHAdeMO at 6 stations; J1772 (Level 2) at 3 stations; NACS / Tesla at 1 station.
Of these stations, 2 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 9. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Dothan has 11 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Dothan, AL - Tesla Supercharger 1151 Ross Clark Cir | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| Bondy's Ford 3615 Ross Clark Cir | FORD_CHARGE | DC fast 6 DC fast · CCS (J1772 Combo) | September 2026 |
| DU ELECTRIC STATION 2 207 N Saint Andrews St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | September 2026 |
| DU ELECTRIC STATION 1 207 North Saint Andrews St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | September 2026 |
| MERCEDES-FAST HYUNDAI SALES 2329 Ross Clark Cir | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | September 2026 |
| MERCEDES-FAST HYUNDAI LOT 2329 Ross Clark Cir | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | September 2026 |
| DU ELECTRIC DOC 4 407 Taylor Rd | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | September 2026 |
| DU ELECTRIC DOC 3 407 Taylor Rd | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | September 2026 |
| ARBORGATE ARBORGATE 671 Westgate Pkwy | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | September 2026 |
| Domino's Pizza 2115 E Main St | LOOP | 1 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Dothan?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Dothan
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved September 2026. Public stations only.