AZ / Apache Junction
AZ · EV charging
EV charging in Apache Junction, AZ
Here is what NREL's public data shows about EV charging in Apache Junction, AZ. As of NREL AFDC data retrieved July 2026, Apache Junction has 10 public charging stations with 20 Level 2 ports, including 8 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 10Public stations
- 20Level 2 ports
- 8DC fast ports
- 29%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 5 networks: ChargePoint Network (4), EVGATEWAY (3), Blink Network (1), LOOP (1), and 1 more.
Connectors on record: J1772 (Level 2) at 9 stations; CCS (J1772 Combo) at 1 station; NACS / Tesla at 1 station.
Of these stations, 1 list free charging and 2 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 7. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Apache Junction has 10 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Walmart EV Charging 2555 W Apache Trl | WALMART | DC fast 8 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| Apache Junction Multi-Generational Facility 1035 N. Idaho Road | Blink Network | 4 Level 2 · J1772 (Level 2) | July 2026 |
| AJ Apartments - Office 357 S Winchester Rd | EVGATEWAY | 2 Level 2 · J1772 (Level 2) | July 2026 |
| AJ Apartments - Winchester 230 N Winchester Rd | EVGATEWAY | 2 Level 2 · J1772 (Level 2) | July 2026 |
| AJ Apartments - Superstition views 420 E 2nd Ave | EVGATEWAY | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Superstition Sunrise RV Resort 702 S Meridian Rd | LOOP | 2 Level 2 · J1772 (Level 2) | July 2026 |
| COHERE LIFE BR1 10075 South Dutchman Drive | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| COHERE LIFE BR2 10075 South Dutchman Drive | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| COHERE LIFE BR4 10200 South Picacho | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| COHERE LIFE BR3 10109 South Dutchman Drive | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Apache Junction?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Apache Junction
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.