CO / Arvada
CO · EV charging
EV charging in Arvada, CO
Here is what NREL's public data shows about EV charging in Arvada, CO. As of NREL AFDC data retrieved July 2026, Arvada has 9 public charging stations with 22 Level 2 ports, including 24 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 9Public stations
- 22Level 2 ports
- 24DC fast ports
- 52%Ports that are DC fast
Stations are operated across 6 networks: Blink Network (3), eVgo Network (2), Non-networked (1), Electrify America (1), and 2 more.
Connectors on record: J1772 (Level 2) at 5 stations; CCS (J1772 Combo) at 3 stations; CHAdeMO at 2 stations; NACS / Tesla at 1 station.
Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 8. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Arvada has 9 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Arvada, CO - Tesla Supercharger 7360 W 56th Ave | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| Lloyd King Center 6350 Sheridan Blvd | eVgo Network | DC fast 6 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Ralston Square Shopping Center 12350 W 64th Ave | eVgo Network | DC fast 6 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Walmart 4734 (Arvada, CO) 9400 Ralston Road | Electrify America | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| Olde Town Transit Hub 7510 Grandview Ave | Non-networked | 8 Level 2 · J1772 (Level 2) | ⚠ September 2024 |
| Standley Lake Library 8485 Kipling Street | Blink Network | 6 Level 2 · J1772 (Level 2) | July 2026 |
| Solana Olde Town Station 6875 W 56th Ave | Blink Network | 4 Level 2 · J1772 (Level 2) | July 2026 |
| AMPCAP 0727 ARVADA 15680 W 64th Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| AVi at Olde Town 5352 Allison St | Blink Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 1 of Arvada's 9 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Arvada?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Arvada
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.