ChargingAtlas

CO / Pueblo

CO · EV charging

EV charging in Pueblo, CO

Here is what NREL's public data shows about EV charging in Pueblo, CO. As of NREL AFDC data retrieved July 2026, Pueblo has 38 public charging stations with 55 Level 2 ports, including 27 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 2 stations list free charging

Stations are operated across 7 networks: ChargePoint Network (29), Non-networked (3), EVGATEWAY (2), Electrify America (1), and 3 more.

Connectors on record: J1772 (Level 2) at 30 stations; CCS (J1772 Combo) at 8 stations; CHAdeMO at 5 stations; NACS / Tesla at 2 stations.

Of these stations, 2 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 36. Always confirm current pricing with the network before you charge.

2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Pueblo has 38 public stations in all — see the map above.

StationNetworkChargingConfirmed
Pueblo, CO - Tesla Supercharger
101-149 Richmond Avenue
Tesla DC fast 12 DC fast · NACS / Tesla June 2026
Sam's Club 6549 (Pueblo, CO)
412 Eagleridge Blvd.
Electrify America DC fast 4 DC fast · CCS (J1772 Combo) July 2026
Sangre De Cristo Art Center
210 N Santa Fe Ave
EVGATEWAY DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
Sangre de Cristo Arts & Conference Center
210 N Santa Fe Ave
Non-networked DC fast 2 DC fast · CCS (J1772 Combo) ⚠ March 2024
Dave Solon Nissan
2525 W US Highway 50
Non-networked DC fast 1 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) January 2026
7-ELEVEN, INC. 32990PUEBLO PL2
3510 N Elizabeth St
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
7-ELEVEN, INC. 32990PUEBLO PL1
3510 N Elizabeth St
ChargePoint Network DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla July 2026
SPRADLEY CHEVY SHYUNDAI 1
2148 US-50
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
SPRADLEY CHEVY SHYUNDAI 2
2148 US-50
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
Pueblo County Courthouse
215 W 10th St
EVGATEWAY 6 Level 2 · J1772 (Level 2) July 2026

⚠ 2 of Pueblo's 38 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Pueblo?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Pueblo

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.