CT / Ellington
CT · EV charging
EV charging in Ellington, CT
Here is what NREL's public data shows about EV charging in Ellington, CT. As of NREL AFDC data retrieved July 2026, Ellington has 10 public charging stations with 20 Level 2 ports, including 4 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 10Public stations
- 20Level 2 ports
- 4DC fast ports
- 17%Ports that are DC fast
Stations are operated across 4 networks: ChargePoint Network (6), AMPUP (2), VIALYNK (1), LOOP (1).
Connectors on record: J1772 (Level 2) at 8 stations; CCS (J1772 Combo) at 3 stations; NACS / Tesla at 2 stations.
Of these stations, 2 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 8. Always confirm current pricing with the network before you charge.
2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Ellington has 10 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Bolles Motors Ellington 84 West Road | VIALYNK | DC fast 2 DC fast + 6 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| EARTHLIGHT CPE250_1 128 West Rd | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| EARTHLIGHT CPE250_2 128 West Rd | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| 135 West Rd 135 West Rd | LOOP | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Ellington Town Hall 21 Main St | AMPUP | 2 Level 2 · J1772 (Level 2) | June 2026 |
| EARTHLIGHT EARTHLIGHT HQ / 128 West Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| EARTHLIGHT HQ ELT HQ-L2-1 128 West Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| TOWN HALL ANNEX 57 Main St | AMPUP | 2 Level 2 · J1772 (Level 2) | ⚠ December 2023 |
| MODERN MILKMAN OAK2 80 Meadow Brook Rd | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| MODERN MILKMAN OAK1 80 Meadow Brook Rd | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 1 of Ellington's 10 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Ellington?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Ellington
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.