CT / Litchfield
CT · EV charging
EV charging in Litchfield, CT
Here is what NREL's public data shows about EV charging in Litchfield, CT. As of NREL AFDC data retrieved July 2026, Litchfield has 17 public charging stations with 16 Level 2 ports, including 7 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 17Public stations
- 16Level 2 ports
- 7DC fast ports
- 30%Ports that are DC fast
Stations are operated across 1 network: ChargePoint Network (17).
Connectors on record: J1772 (Level 2) at 13 stations; CCS (J1772 Combo) at 4 stations; CHAdeMO at 1 station.
Notable charging stations
The largest sites by port count, DC fast first. Litchfield has 17 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| LITCHFIELD FORD POWER LINK 1 439 Bantam Rd | ChargePoint Network | DC fast 2 DC fast · CCS (J1772 Combo) | July 2026 |
| LITCHFIELD FORD POWER LINK 2 US-202 | ChargePoint Network | DC fast 2 DC fast · CCS (J1772 Combo) | July 2026 |
| LITCHFIELD FORD POWER LINK 3 439 Bantam Road | ChargePoint Network | DC fast 2 DC fast · CCS (J1772 Combo) | July 2026 |
| LITCHFIELD MUNI CPE250-1 39 West Street | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| LITCHFIELD FORD STATION 2 439 Bantam Road | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| LITCHFIELD FORD STATION 1 439 Bantam Road | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| LITCHFIELD FORD STATION 3 439 Bantam Road | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| LITCHFIELD MUNI LOT - 2L 39 West Street | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| LITCHFIELD MUNI LOT - 2R 39 West Street | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| LITCHFIELD MUNI LOT - 1R 39 West Street | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Litchfield?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Litchfield
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.