CT / Niantic
CT · EV charging
EV charging in Niantic, CT
Here is what NREL's public data shows about EV charging in Niantic, CT. As of NREL AFDC data retrieved July 2026, Niantic has 9 public charging stations with 15 Level 2 ports, including 4 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 9Public stations
- 15Level 2 ports
- 4DC fast ports
- 21%Ports that are DC fast
⚡ 2 stations list free charging
Stations are operated across 3 networks: ChargePoint Network (4), LOOP (3), Non-networked (2).
Connectors on record: J1772 (Level 2) at 8 stations; CCS (J1772 Combo) at 1 station.
Of these stations, 2 list free charging and 3 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 4. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Niantic has 9 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| East Lyme Town Hall 118 Pennsylvania Ave | LOOP | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| Rocky Neck State Park 244 W Main St | Non-networked | 2 Level 2 · J1772 (Level 2) | June 2026 |
| MHA DOUGLAS 4 14 Capitol Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| MHA NOLA 10 2 Nola Pl | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| MHA DOUGLAS 6 15 Douglas Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| MHA DOUGLAS 18 7 Douglas Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| East Lyme Hope Street Parking Lot 11 Hope St | LOOP | 2 Level 2 · J1772 (Level 2) | July 2026 |
| East Lyme Methodist Street Parking Lot 5 Methodist St | LOOP | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Crest Ford 218 Flanders Rd | Non-networked | 1 Level 2 · J1772 (Level 2) | June 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Niantic?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Niantic
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.