GA / Cumming
GA · EV charging
EV charging in Cumming, GA
Here is what NREL's public data shows about EV charging in Cumming, GA. As of NREL AFDC data retrieved September 2026, Cumming has 21 public charging stations with 108 Level 2 ports, including 30 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 21Public stations
- 108Level 2 ports
- 30DC fast ports
- 22%Ports that are DC fast
Stations are operated across 9 networks: ChargePoint Network (11), Non-networked (2), ENVIROSPARK (2), eVgo Network (1), and 5 more.
Connectors on record: J1772 (Level 2) at 16 stations; CCS (J1772 Combo) at 5 stations; CHAdeMO at 3 stations; NACS / Tesla at 2 stations.
Of these stations, 2 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 19. Always confirm current pricing with the network before you charge.
2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Cumming has 21 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Cumming, GA - Tesla Supercharger 501 Lakeland Plaza | Tesla | DC fast 16 DC fast · NACS / Tesla | June 2026 |
| Lanier Crossing 655 Atlanta Hwy | eVgo Network | DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) | September 2026 |
| Lou Sobh Kia 1135 Buford Rd | EVGATEWAY | DC fast 4 DC fast · CCS (J1772 Combo), NACS / Tesla | September 2026 |
| Billy Howell Ford 1805 Atlanta Hwy | FORD_CHARGE | DC fast 4 DC fast · CCS (J1772 Combo) | September 2026 |
| Nalley Nissan - Cumming 1310 Buford Hd | Non-networked | DC fast 1 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) | January 2026 |
| GEORGIA POWER CUMMING DC1 1610 Market Pl Blvd | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | September 2026 |
| Hewer at The Crossing 4160 Coal Mountain Crossing | RED_E | 54 Level 2 · J1772 (Level 2) | September 2026 |
| Qwik Charge Inc 925 Sanders Rd | Non-networked | 20 Level 2 · J1772 (Level 2) | ⚠ unknown |
| Garys Wine and More 3010 River Club Dr | ENVIROSPARK | 10 Level 2 · J1772 (Level 2) | November 2025 |
| GEORGIA POWER CUMMING L2 1610 Market Pl Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | September 2026 |
⚠ 1 of Cumming's 21 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Cumming?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Cumming
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved September 2026. Public stations only.