GA / Douglasville
GA · EV charging
EV charging in Douglasville, GA
Here is what NREL's public data shows about EV charging in Douglasville, GA. As of NREL AFDC data retrieved July 2026, Douglasville has 8 public charging stations with 15 Level 2 ports, including 16 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 8Public stations
- 15Level 2 ports
- 16DC fast ports
- 52%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 6 networks: ChargePoint Network (3), Non-networked (1), Electrify America (1), Tesla (1), and 2 more.
Connectors on record: J1772 (Level 2) at 6 stations; CHAdeMO at 1 station; CCS (J1772 Combo) at 1 station; NACS / Tesla at 1 station.
Of these stations, 1 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 6. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Douglasville has 8 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Douglasville, GA - Tesla Supercharger 2950 Chapel Hill Road | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| Site Centers Market Square (Douglasville, GA) 9503-9579 Bill Arp Rd | Electrify America | DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Sweetwater Vista Apartments 1905 Riverside Parkway | Blink Network | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Library of Douglas (Satilla Regional Library System) 200 S Madison Ave | ENVIROSPARK | 4 Level 2 · J1772 (Level 2) | November 2025 |
| DVILLE EV CHRG PKG GAR-1 6704 Church St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| DVILLE EV CHRG PKG GAR-2 6704 Church St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| DOCTOR DOCTOR 2 8954 Hospital Drive | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Kritters Country Club 7377 W Strickland St | Non-networked | 1 Level 2 · J1772 (Level 2) | ⚠ December 2024 |
⚠ 1 of Douglasville's 8 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Douglasville?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Douglasville
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.