ChargingAtlas

IA / Cedar Rapids

IA · EV charging

EV charging in Cedar Rapids, IA

Here is what NREL's public data shows about EV charging in Cedar Rapids, IA. As of NREL AFDC data retrieved July 2026, Cedar Rapids has 28 public charging stations with 55 Level 2 ports, including 15 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 6 stations list free charging

Stations are operated across 8 networks: ChargePoint Network (15), Non-networked (6), Tesla Destination (2), Tesla (1), and 4 more.

Connectors on record: J1772 (Level 2) at 23 stations; CCS (J1772 Combo) at 4 stations; NACS / Tesla at 3 stations; CHAdeMO at 2 stations.

Of these stations, 6 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 22. Always confirm current pricing with the network before you charge.

3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Cedar Rapids has 28 public stations in all — see the map above.

StationNetworkChargingConfirmed
Cedar Rapids, IA - Tesla Supercharger
20 Wilson Ave Southwest
Tesla DC fast 8 DC fast · NACS / Tesla June 2026
McGrath Chrysler Jeep Dodge Ram
4610 Center Point Road Northeast
Blink Network DC fast 2 DC fast + 2 Level 2 · J1772 (Level 2), CCS (J1772 Combo) July 2026
MAVERIK CEDAR RAPIDS DC
2604 16th Avenue Southwest
ChargePoint Network DC fast 2 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
Indian Creek Nature Center
5300 Otis Rd SE
CHARGELAB DC fast 2 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
McGrath Chevyland
1600 51st St NE
Non-networked DC fast 1 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) July 2026
Park Cedar Rapids - 4th Avenue Ramp
349 4th Ave SE
Non-networked 8 Level 2 · J1772 (Level 2) May 2026
Park Cedar Rapids - Convention Center Ramp
361 1st Ave SE
Non-networked 4 Level 2 · J1772 (Level 2) May 2026
Tru by Hilton Cedar Rapids Westdale
3900 Westdale Pkwy SW
TURNONGREEN 4 Level 2 · J1772 (Level 2) December 2025
Schneider Electric - Visitor Lot
3400 Square D Dr SW
Non-networked 2 Level 2 · J1772 (Level 2) December 2025
NewBo City Market
1100 3rd St SE
Non-networked 2 Level 2 · J1772 (Level 2) June 2026

⚠ 2 of Cedar Rapids's 28 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Cedar Rapids?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Cedar Rapids

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.