IA / Waukee
IA · EV charging
EV charging in Waukee, IA
Here is what NREL's public data shows about EV charging in Waukee, IA. As of NREL AFDC data retrieved July 2026, Waukee has 11 public charging stations with 17 Level 2 ports, including 10 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 11Public stations
- 17Level 2 ports
- 10DC fast ports
- 37%Ports that are DC fast
Stations are operated across 4 networks: ChargePoint Network (8), Electrify America (1), RED_E (1), CHARGELAB (1).
Connectors on record: J1772 (Level 2) at 9 stations; CCS (J1772 Combo) at 3 stations; CHAdeMO at 1 station.
Notable charging stations
The largest sites by port count, DC fast first. Waukee has 11 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Waukee Kum & Go 540 (Waukee, Iowa) 3105 Grand Prairie Parkway | Electrify America | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| 155 West Hickman Road, Waukee, IA, 50263 155 Hickman Road | CHARGELAB | DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Stivers Ford PRO Elite 1300 SE Stoneridge | RED_E | DC fast 2 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| HY VEE WAUKEE 2 1005 Hickman Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| HY VEE WAUKEE 1 1005 Hickman Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| PALM THEATRE & FRIDLEY 1 85 NE Dartmoor Dr 200 NE Westgate Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| PALM THEATRE & FRIDLEY 2 125 NE Dartmoor Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| ALOFT WAUKEE STATION 2 2848 Grand Prairie Parkway | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| ALOFT WAUKEE STATION 1 2848 Grand Prairie Parkway | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| UIOWA MISSION #2 2565 SE Encompass Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Waukee?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Waukee
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.