ID / Pocatello
ID · EV charging
EV charging in Pocatello, ID
Here is what NREL's public data shows about EV charging in Pocatello, ID. As of NREL AFDC data retrieved July 2026, Pocatello has 10 public charging stations with 8 Level 2 ports, including 16 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 10Public stations
- 8Level 2 ports
- 16DC fast ports
- 67%Ports that are DC fast
Stations are operated across 6 networks: Blink Network (3), Non-networked (3), IN_CHARGE (1), Tesla (1), and 2 more.
Connectors on record: CCS (J1772 Combo) at 5 stations; J1772 (Level 2) at 4 stations; CHAdeMO at 3 stations; NACS / Tesla at 1 station.
Of these stations, 3 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 7. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Pocatello has 10 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Pocatello, ID - Tesla Supercharger 1399 Bench Road | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| Hirning Buick GMC 509 Yellowstone Ave | Non-networked | DC fast 2 DC fast · CHAdeMO, CCS (J1772 Combo) | ⚠ July 2024 |
| Cole Chevrolet 1325 Yellowstone Ave | Non-networked | DC fast 2 DC fast · CCS (J1772 Combo) | ⚠ July 2024 |
| Hirning Buick GMC 509 Yellowstone Ave | RED_E | DC fast 2 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Cole Nissan Kia 1900 Flandro Dr | IN_CHARGE | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | January 2026 |
| L099 POCATELLO PL 633 Bullock St | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| Courtyard 290 Vista Drive | Blink Network | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Fairfield by Marriott 205 Via Venitio | Blink Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Northgate Apartments 1500 E Venture Way | Blink Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| Cole Nissan Kia 1900 Flandro Dr | Non-networked | 1 Level 2 · J1772 (Level 2) | January 2026 |
⚠ 2 of Pocatello's 10 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Pocatello?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Pocatello
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.