MA / Bolton
MA · EV charging
EV charging in Bolton, MA
Here is what NREL's public data shows about EV charging in Bolton, MA. As of NREL AFDC data retrieved July 2026, Bolton has 25 public charging stations with 28 Level 2 ports, all Level 2 (no DC fast charging on record).
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 25Public stations
- 28Level 2 ports
- 0DC fast ports
- 0%Ports that are DC fast
Stations are operated across 2 networks: ChargePoint Network (24), LOOP (1).
Connectors on record: J1772 (Level 2) at 25 stations.
Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 24. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Bolton has 25 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| DPW PUBLIC SAFETY 15 Wattaquadock Hill Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| DPW DPW YARD 12 Forbush Mill Road | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| 580 Main St 580 Main St | LOOP | 2 Level 2 · J1772 (Level 2) | July 2026 |
| ALTA NASHOBA 7 588 Main Street | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| ALTA NASHOBA 8 588 Main Street | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| ALTA NASHOBA 9 586 Main Street | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| ALTA NASHOBA 10 586 Main Street | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| ALTA NASHOBA 11 586 Main Street | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| ALTA NASHOBA 12 586 Main Street | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| ALTA NASHOBA GARAGE B BAY 1 584 Main Street | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Bolton?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Bolton
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.