MA / Bridgewater
MA · EV charging
EV charging in Bridgewater, MA
Here is what NREL's public data shows about EV charging in Bridgewater, MA. As of NREL AFDC data retrieved July 2026, Bridgewater has 28 public charging stations with 55 Level 2 ports, including 18 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 28Public stations
- 55Level 2 ports
- 18DC fast ports
- 25%Ports that are DC fast
Stations are operated across 6 networks: ChargePoint Network (17), Non-networked (5), RED_E (3), FLO (1), and 2 more.
Connectors on record: J1772 (Level 2) at 20 stations; CCS (J1772 Combo) at 8 stations; CHAdeMO at 5 stations.
Of these stations, 2 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 26. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Bridgewater has 28 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Valley Storage 15 Whitman St East | RED_E | DC fast 6 DC fast · CCS (J1772 Combo) | July 2026 |
| Market Basket West Bridgewater #70 352 W Center St West | eVgo Network | DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Mechanics Co-op Bank Bridgewater 72 Main St | AUTEL | DC fast 2 DC fast · CCS (J1772 Combo) | August 2025 |
| Mechanics Cooperative Bank Bridgewater 72 Main Street | RED_E | DC fast 2 DC fast · CCS (J1772 Combo) | July 2026 |
| MASSDOT NBBRIDGEWATER R Fall River Expy, | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| MASSDOT NBBRIDGEWATER L Fall River Expy, | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| MASSDOT SBBRIDGEWATER L MA-24 | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| MASSDOT SBBRIDGEWATER R Route 24 Southbound | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Bridgewater State University Dana Mohler-Faria Science & Mathematics Center 24 Park Ave | Non-networked | 8 Level 2 · J1772 (Level 2) | February 2026 |
| Bridgewater State University Weygand Lot 85 Burrill Ave | Non-networked | 6 Level 2 · J1772 (Level 2) | ⚠ October 2024 |
⚠ 2 of Bridgewater's 28 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Bridgewater?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Bridgewater
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.