ChargingAtlas

MA / Brookline

MA · EV charging

EV charging in Brookline, MA

Here is what NREL's public data shows about EV charging in Brookline, MA. As of NREL AFDC data retrieved July 2026, Brookline has 23 public charging stations with 41 Level 2 ports, including 2 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 2 networks: ChargePoint Network (22), RED_E (1).

Connectors on record: J1772 (Level 2) at 21 stations; CCS (J1772 Combo) at 2 stations; NACS / Tesla at 2 stations.

2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Brookline has 23 public stations in all — see the map above.

StationNetworkChargingConfirmed
BROOKLINE WEBSTERST LEFT
13 Webster Street
ChargePoint Network DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla July 2026
BROOKLINE WEBSTERST RIGHT
13 Webster Street
ChargePoint Network DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla July 2026
BROOKLINE HEALTH 2
32 Pierce St
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
BROOKLINE CENTRE EAST LOT
11-51 Centre St
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
BROOKLINE HEALTH 1
32 Pierce St
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
BROOKLINE BABCOCK STREET
Babcock Street Parking Lot
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
HGI BROOKLINE HGI BROOKLINE
700 Brookline Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
5 WASHINGTON LEFT
3 Washington St
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
BROOKLINE DRISCOLL 1
725 Washington Street
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
BROOKLINE REC CENTER
149 Eliot St
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Brookline?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Brookline

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.