MA / Burlington
MA · EV charging
EV charging in Burlington, MA
Here is what NREL's public data shows about EV charging in Burlington, MA. As of NREL AFDC data retrieved July 2026, Burlington has 46 public charging stations with 89 Level 2 ports, including 23 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 46Public stations
- 89Level 2 ports
- 23DC fast ports
- 21%Ports that are DC fast
⚡ 2 stations list free charging
Stations are operated across 6 networks: ChargePoint Network (41), Electrify America (1), Tesla (1), Non-networked (1), and 2 more.
Connectors on record: J1772 (Level 2) at 42 stations; CCS (J1772 Combo) at 4 stations; NACS / Tesla at 1 station.
Of these stations, 2 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 44. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Burlington has 46 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Burlington, MA - Tesla Supercharger 75 Middlesex Turnpike | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| Albertsons Burlington #0495 180 A Cambridge Street | eVgo Network | DC fast 6 DC fast · CCS (J1772 Combo) | July 2026 |
| Burlington Mall (Burlington, MA) 73 Burlington Mall Road | Electrify America | DC fast 3 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| NOURIA BURLINGTON 1 61 Middlesex Turnpike | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| NOURIA BURLINGTON 2 61 Middlesex Turnpike | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| SWTCH Energy 200 Summit Dr | SWTCH | 9 Level 2 · J1772 (Level 2) | January 2026 |
| TOWN HALL 1 TOWN HALL 1 1 Dearborn Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| STATION 1 MARRIOTT BURL 1 Burlington Mall Road | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| THE CENTER STATION 1 25 Corporate Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| LHMC GARAGE LV2 #4 41 Burlington Mall Road | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 1 of Burlington's 46 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Burlington?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Burlington
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.