MA / Holyoke
MA · EV charging
EV charging in Holyoke, MA
Here is what NREL's public data shows about EV charging in Holyoke, MA. As of NREL AFDC data retrieved July 2026, Holyoke has 24 public charging stations with 34 Level 2 ports, including 41 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 24Public stations
- 34Level 2 ports
- 41DC fast ports
- 55%Ports that are DC fast
Stations are operated across 6 networks: ChargePoint Network (13), FLO (7), Non-networked (1), RIVIAN_ADVENTURE (1), and 2 more.
Connectors on record: J1772 (Level 2) at 15 stations; CCS (J1772 Combo) at 8 stations; CHAdeMO at 4 stations; NACS / Tesla at 3 stations.
3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Holyoke has 24 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Holyoke, MA - Tesla Supercharger 40 Holyoke St | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| Holyoke MB.HPC 245 Whiting Farms Rd | MERCEDES_BENZ | DC fast 12 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| Holyoke, MA 45 Holyoke Street | RIVIAN_ADVENTURE | DC fast 9 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| MARCOTTE FORD L3-1 1025 Main Street | ChargePoint Network | DC fast 2 DC fast · CCS (J1772 Combo) | July 2026 |
| MARCOTTE FORD L3-2 1025 Main Street | ChargePoint Network | DC fast 2 DC fast · CCS (J1772 Combo) | July 2026 |
| GARY ROME LVL 3 STATION 1 150 Whiting Farms Rd | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| GARY ROME LVL 3 STATION 2 150 Whiting Farms Rd | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| GPM INVESTMENTS 626 DC2 1533 Dwight St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| GPM INVESTMENTS 626 DC1 1533 Dwight St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Holyoke YMCA, Pine Street, Holyoke, MA 157 Pine Street | FLO | 4 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Holyoke?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Holyoke
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.