MA / Saugus
MA · EV charging
EV charging in Saugus, MA
Here is what NREL's public data shows about EV charging in Saugus, MA. As of NREL AFDC data retrieved July 2026, Saugus has 8 public charging stations with 21 Level 2 ports, including 9 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 8Public stations
- 21Level 2 ports
- 9DC fast ports
- 30%Ports that are DC fast
Stations are operated across 5 networks: AMPUP (3), VIALYNK (2), Electrify America (1), RED_E (1), and 1 more.
Connectors on record: J1772 (Level 2) at 7 stations; CCS (J1772 Combo) at 2 stations; CHAdeMO at 1 station.
Notable charging stations
The largest sites by port count, DC fast first. Saugus has 8 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Saugus 334 Broadway - Route 1 | eVgo Network | DC fast 6 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Walmart 3114 (Saugus, MA) 770 Broadway | Electrify America | DC fast 3 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| Essex Landing Garage Parking 30 Collins Ave | AMPUP | 6 Level 2 · J1772 (Level 2) | ⚠ October 2022 |
| Eastern Bank Saugus MA 605 Broadway | RED_E | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Grandeville at Saugus Building 2 860 Broadway | VIALYNK | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Essex Landing 3 40 Collins Ave | AMPUP | 2 Level 2 · J1772 (Level 2) | ⚠ October 2022 |
| Essex Landing 2 44 Collins Ave | AMPUP | 2 Level 2 · J1772 (Level 2) | ⚠ October 2022 |
| Grandeville at Saugus Building 1 860 Broadway | VIALYNK | 2 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 3 of Saugus's 8 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Saugus?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Saugus
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.