MD / Nottingham
MD · EV charging
EV charging in Nottingham, MD
Here is what NREL's public data shows about EV charging in Nottingham, MD. As of NREL AFDC data retrieved July 2026, Nottingham has 12 public charging stations with 17 Level 2 ports, including 14 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 12Public stations
- 17Level 2 ports
- 14DC fast ports
- 45%Ports that are DC fast
Stations are operated across 4 networks: ChargePoint Network (8), Blink Network (2), eVgo Network (1), Tesla (1).
Connectors on record: J1772 (Level 2) at 10 stations; CHAdeMO at 1 station; CCS (J1772 Combo) at 1 station; NACS / Tesla at 1 station.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Nottingham has 12 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Nottingham, MD - Tesla Supercharger 7560 Belair Rd | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| Nottingham Commons 5267 Cambell Blvd | eVgo Network | DC fast 6 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| The Traffic Group 9900 Franklin Square Drive | Blink Network | 4 Level 2 · J1772 (Level 2) | July 2026 |
| MTA BUS W. MARSH23 8476 Honeygo Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| BGE WORKPLACE PARRY HALL BGE 9701 Belair Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| MTA WHITE MARSH 4,5 8476 Honeygo Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| JERRYS TOYOTA CUSTOMER PARKIN 8001 Belair Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| MTA BUS W. MARSH1 8476 Honeygo Blvd | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| IKEA USA BALTIMORE-DC 4 8352 Honeygo Blvd | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| IKEA USA BALTIMORE-DC 1 8352 Honeygo Blvd | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Nottingham?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Nottingham
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.