ChargingAtlas

ME / Auburn

ME · EV charging

EV charging in Auburn, ME

Here is what NREL's public data shows about EV charging in Auburn, ME. As of NREL AFDC data retrieved July 2026, Auburn has 18 public charging stations with 23 Level 2 ports, including 10 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 1 station lists free charging

Stations are operated across 4 networks: ChargePoint Network (14), Non-networked (2), EV Connect (1), FORD_CHARGE (1).

Connectors on record: J1772 (Level 2) at 12 stations; CCS (J1772 Combo) at 7 stations; CHAdeMO at 5 stations.

Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 17. Always confirm current pricing with the network before you charge.

Notable charging stations

The largest sites by port count, DC fast first. Auburn has 18 public stations in all — see the map above.

StationNetworkChargingConfirmed
Rowe Auburn
699 Center St
FORD_CHARGE DC fast 4 DC fast · CCS (J1772 Combo) July 2026
Lee Nissan Auburn Service
793 Center St
Non-networked DC fast 1 DC fast + 2 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) January 2026
ROWEAUBURN001 H-EXPRESS 250-2
699 Center St
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
ROWEAUBURN001 H-EXPRESS 250-1
699 Center St
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
Lee GMC Truck Center
855 CENTER ST
EV Connect DC fast 1 DC fast · CCS (J1772 Combo) July 2026
IRVINGOIL ME-ABRN-L3-0001
1813 Washington St S
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
IRVINGOIL ME-ABRN-L3-0002
1813 Washington St S
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
LEE HONDA STATION01
777 Center St
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
City of Auburn - Parking Garage
60 Court St
Non-networked 2 Level 2 · J1772 (Level 2) April 2026
EMERSON TOYOTA STATION 1
990 Center St
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Auburn?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Auburn

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.