ME / Auburn
ME · EV charging
EV charging in Auburn, ME
Here is what NREL's public data shows about EV charging in Auburn, ME. As of NREL AFDC data retrieved July 2026, Auburn has 18 public charging stations with 23 Level 2 ports, including 10 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 18Public stations
- 23Level 2 ports
- 10DC fast ports
- 30%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 4 networks: ChargePoint Network (14), Non-networked (2), EV Connect (1), FORD_CHARGE (1).
Connectors on record: J1772 (Level 2) at 12 stations; CCS (J1772 Combo) at 7 stations; CHAdeMO at 5 stations.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 17. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Auburn has 18 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Rowe Auburn 699 Center St | FORD_CHARGE | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| Lee Nissan Auburn Service 793 Center St | Non-networked | DC fast 1 DC fast + 2 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) | January 2026 |
| ROWEAUBURN001 H-EXPRESS 250-2 699 Center St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| ROWEAUBURN001 H-EXPRESS 250-1 699 Center St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Lee GMC Truck Center 855 CENTER ST | EV Connect | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| IRVINGOIL ME-ABRN-L3-0001 1813 Washington St S | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| IRVINGOIL ME-ABRN-L3-0002 1813 Washington St S | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| LEE HONDA STATION01 777 Center St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| City of Auburn - Parking Garage 60 Court St | Non-networked | 2 Level 2 · J1772 (Level 2) | April 2026 |
| EMERSON TOYOTA STATION 1 990 Center St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Auburn?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Auburn
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.