ChargingAtlas

MI / Bay City

MI · EV charging

EV charging in Bay City, MI

Here is what NREL's public data shows about EV charging in Bay City, MI. As of NREL AFDC data retrieved July 2026, Bay City has 13 public charging stations with 16 Level 2 ports, including 18 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 6 stations list free charging

Stations are operated across 6 networks: Non-networked (6), ChargePoint Network (2), Blink Network (2), Tesla (1), and 2 more.

Connectors on record: J1772 (Level 2) at 8 stations; CCS (J1772 Combo) at 3 stations; NEMA 14-50 (Level 2) at 2 stations; NACS / Tesla at 1 station; CHAdeMO at 1 station.

Of these stations, 6 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 7. Always confirm current pricing with the network before you charge.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Bay City has 13 public stations in all — see the map above.

StationNetworkChargingConfirmed
Bay City, MI - Tesla Supercharger
2980 E Wilder Rd
Tesla DC fast 8 DC fast · NACS / Tesla June 2026
Meijer Bay City (Bay City, MI)
2980 Wilder Rd
Electrify America DC fast 4 DC fast · CCS (J1772 Combo) July 2026
Garber Ford Bay City - DCFC
3980 North Euclid Avenue
Blink Network DC fast 4 DC fast · CCS (J1772 Combo) July 2026
Graff Chevrolet Bay City MI
3636 Wilder Rd
RED_E DC fast 2 DC fast + 2 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) July 2026
Garber Ford Bay City - Series
3980 North Euclid Avenue
Blink Network 4 Level 2 · J1772 (Level 2) July 2026
Showcase Mitsubishi
1242 S Euclid Ave
Non-networked 3 Level 2 · J1772 (Level 2) July 2025
Thelen Audi Volkswagen Mazda
1112 N Euclid Ave
Non-networked 2 Level 2 · J1772 (Level 2) August 2025
MICHIGAN DEPART STATION 1
3582 State Park Dr
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
MICHIGAN DEPART STATION 2
3582 State Park Dr
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
Graff Chevrolet
3636 Wilder Rd
Non-networked 1 Level 2 · J1772 (Level 2) July 2025

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Bay City?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Bay City

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.