MI / Bay City
MI · EV charging
EV charging in Bay City, MI
Here is what NREL's public data shows about EV charging in Bay City, MI. As of NREL AFDC data retrieved July 2026, Bay City has 13 public charging stations with 16 Level 2 ports, including 18 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 13Public stations
- 16Level 2 ports
- 18DC fast ports
- 53%Ports that are DC fast
⚡ 6 stations list free charging
Stations are operated across 6 networks: Non-networked (6), ChargePoint Network (2), Blink Network (2), Tesla (1), and 2 more.
Connectors on record: J1772 (Level 2) at 8 stations; CCS (J1772 Combo) at 3 stations; NEMA 14-50 (Level 2) at 2 stations; NACS / Tesla at 1 station; CHAdeMO at 1 station.
Of these stations, 6 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 7. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Bay City has 13 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Bay City, MI - Tesla Supercharger 2980 E Wilder Rd | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| Meijer Bay City (Bay City, MI) 2980 Wilder Rd | Electrify America | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| Garber Ford Bay City - DCFC 3980 North Euclid Avenue | Blink Network | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| Graff Chevrolet Bay City MI 3636 Wilder Rd | RED_E | DC fast 2 DC fast + 2 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| Garber Ford Bay City - Series 3980 North Euclid Avenue | Blink Network | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Showcase Mitsubishi 1242 S Euclid Ave | Non-networked | 3 Level 2 · J1772 (Level 2) | July 2025 |
| Thelen Audi Volkswagen Mazda 1112 N Euclid Ave | Non-networked | 2 Level 2 · J1772 (Level 2) | August 2025 |
| MICHIGAN DEPART STATION 1 3582 State Park Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| MICHIGAN DEPART STATION 2 3582 State Park Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Graff Chevrolet 3636 Wilder Rd | Non-networked | 1 Level 2 · J1772 (Level 2) | July 2025 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Bay City?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Bay City
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.