MI / Flint
MI · EV charging
EV charging in Flint, MI
Here is what NREL's public data shows about EV charging in Flint, MI. As of NREL AFDC data retrieved July 2026, Flint has 10 public charging stations with 14 Level 2 ports, including 14 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 10Public stations
- 14Level 2 ports
- 14DC fast ports
- 50%Ports that are DC fast
Stations are operated across 6 networks: Non-networked (2), ChargePoint Network (2), Blink Network (2), RED_E (2), and 2 more.
Connectors on record: J1772 (Level 2) at 6 stations; CCS (J1772 Combo) at 5 stations; NACS / Tesla at 1 station.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Flint has 10 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Randy Wise Hyundai 4350 Lennon Road | Blink Network | DC fast 4 DC fast + 2 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| FasCharge 4649 Express Stop Flint MI 3930 Corunna Rd | RED_E | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| FasCharge 5085 1Stop Mobil Flint 2374 W Hill Rd | RED_E | DC fast 2 DC fast · CCS (J1772 Combo) | July 2026 |
| FLINT OF S H SLOAN MUSEUM PL 1231 E Kearsley St | ChargePoint Network | DC fast 2 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| Lafontaine Ford Grand Blanc 2229 W Hill Rd | FORD_CHARGE | DC fast 2 DC fast · CCS (J1772 Combo) | July 2026 |
| Shea Chevrolet 5135 Corunna Rd | Non-networked | 4 Level 2 · J1772 (Level 2) | July 2025 |
| Westwood Village 3366 Northwood Dr | FLIPTURN | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Sloan Museum Archives 1221 E Kearsley St | Non-networked | 2 Level 2 · J1772 (Level 2) | ⚠ June 2022 |
| CAMPUS CENTER HORSESHOE 1700 University Avenue Campus Horseshoe Visit | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| LOT T 415 Wallenberg Street | Blink Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 1 of Flint's 10 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Flint?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Flint
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.