MI / Grandville
MI · EV charging
EV charging in Grandville, MI
Here is what NREL's public data shows about EV charging in Grandville, MI. As of NREL AFDC data retrieved July 2026, Grandville has 13 public charging stations with 29 Level 2 ports, including 2 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 13Public stations
- 29Level 2 ports
- 2DC fast ports
- 6%Ports that are DC fast
⚡ 4 stations list free charging
Stations are operated across 4 networks: ChargePoint Network (6), Non-networked (5), Blink Network (1), RED_E (1).
Connectors on record: J1772 (Level 2) at 11 stations; CHAdeMO at 2 stations; CCS (J1772 Combo) at 2 stations.
Of these stations, 4 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 9. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Grandville has 13 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| JH FAMILY STORE J&H DC1 4380 Kenowa Ave SW | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| JH FAMILY STORE J&H DC2 4380 Kenowa Ave SW | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Staybridge Suites 3675 Potomac Cir SW | Non-networked | 6 Level 2 · J1772 (Level 2) | July 2026 |
| Comfort Suites Grandville - Grand Rapids SW 4520 Kenowa Ave SW | Non-networked | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Rodeway Inn 3425 Fairlanes Ave SW | Non-networked | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Borgman Ford Sales Inc. 3150 28th Street Southwest | Blink Network | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Borgman Ford Mazda 3150 28th St SW | Non-networked | 2 Level 2 · J1772 (Level 2) | January 2025 |
| Best Western Plus - Grand Castle Inn & Suites Grand Rapids West 3825 28th St SW | Non-networked | 2 Level 2 · J1772 (Level 2) | July 2026 |
| LIBRARY DOWNTOWN 2 4028 Chicago Dr SW | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Stewardship Trust Advisors 3411 Wilson Ave SW | RED_E | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Grandville?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Grandville
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.