ChargingAtlas

MI / Mackinaw City

MI · EV charging

EV charging in Mackinaw City, MI

Here is what NREL's public data shows about EV charging in Mackinaw City, MI. As of NREL AFDC data retrieved July 2026, Mackinaw City has 9 public charging stations with 16 Level 2 ports, including 19 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 6 networks: ChargePoint Network (3), RED_E (2), Tesla Destination (1), Tesla (1), and 2 more.

Connectors on record: J1772 (Level 2) at 5 stations; CCS (J1772 Combo) at 4 stations; NACS / Tesla at 2 stations; CHAdeMO at 1 station.

2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Mackinaw City has 9 public stations in all — see the map above.

StationNetworkChargingConfirmed
Mackinaw City, MI - Tesla Supercharger
801 South Huron Avenue
Tesla DC fast 8 DC fast · CCS (J1772 Combo), NACS / Tesla June 2026
Mackinaw City, MI
220 South Huron Avenue
RIVIAN_ADVENTURE DC fast 6 DC fast · CCS (J1772 Combo) July 2026
FasCharge Site 5017 Next Door Marathon Mackinaw City
309 S Nicolet St
RED_E DC fast 4 DC fast · CCS (J1772 Combo) July 2026
HION NETWORK MACKINAW DC4
1080 S Nicolet St
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
Mackinaw City Marina - Tesla Destination
107 S Huron Ave
Tesla Destination 4 Level 2 · J1772 (Level 2), NACS / Tesla ⚠ July 2024
Mackinaw City KOA
566 Trails End Rd
Non-networked 4 Level 2 · J1772 (Level 2) July 2025
Mackinaw KOA Camp
566 Trails End Rd
RED_E 4 Level 2 · J1772 (Level 2) July 2026
DAY PARKING LOT STATION #2
450 S Nicolet St
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
DAY PARKING LOT STATION #1
450 S Nicolet St
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026

⚠ 1 of Mackinaw City's 9 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Mackinaw City?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Mackinaw City

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.