ChargingAtlas

MI / Waterford Township

MI · EV charging

EV charging in Waterford Township, MI

Here is what NREL's public data shows about EV charging in Waterford Township, MI. As of NREL AFDC data retrieved July 2026, Waterford Township has 13 public charging stations with 24 Level 2 ports, including 4 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 2 networks: ChargePoint Network (12), EVGATEWAY (1).

Connectors on record: J1772 (Level 2) at 11 stations; CCS (J1772 Combo) at 2 stations; NACS / Tesla at 1 station.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Waterford Township has 13 public stations in all — see the map above.

StationNetworkChargingConfirmed
SUBURBAN FORD DISPENSER 1
6975 Highland Road
ChargePoint Network DC fast 2 DC fast · CCS (J1772 Combo) July 2026
SUBURBAN FORD DISPENSER 2
6975 Highland Road
ChargePoint Network DC fast 2 DC fast · CCS (J1772 Combo) July 2026
Philadelphia Properties Waterford
4194 Airport Rd
EVGATEWAY 4 Level 2 · J1772 (Level 2) July 2026
WATERFALL-JLRS STATION 1
5619 Dixie Hwy
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
PEARLE VISION PEARLE VISION 1
4363 Highland Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
M-59 TOYOTA CT4020-1
4178 Highland Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
OAKLAND SCHOOLS WEST ISLAND
2111 Pontiac Lake Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
OAKLAND SCHOOLS EAST ISLAND
2111 Pontiac Lake Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
PTK TERM OCIA TERMINAL
Patterson Parkway
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
SUBURBAN FORD CHARGER 1-2
6975 Highland Road
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Waterford Township?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Waterford Township

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.