MN / Lakeville
MN · EV charging
EV charging in Lakeville, MN
Here is what NREL's public data shows about EV charging in Lakeville, MN. As of NREL AFDC data retrieved July 2026, Lakeville has 16 public charging stations with 13 Level 2 ports, including 15 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 16Public stations
- 13Level 2 ports
- 15DC fast ports
- 54%Ports that are DC fast
Stations are operated across 3 networks: ChargePoint Network (10), DIRT_ROAD (5), SYNERGEV (1).
Connectors on record: J1772 (Level 2) at 8 stations; CCS (J1772 Combo) at 8 stations; CHAdeMO at 2 stations.
Notable charging stations
The largest sites by port count, DC fast first. Lakeville has 16 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Apple Ford Pro Elite 7200 Lakeville Boulevard | SYNERGEV | DC fast 8 DC fast · CCS (J1772 Combo) | July 2026 |
| MERIDIAN BLUE MERIDIAN 102 7785 218th St W | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| MERIDIAN BLUE MERIDIAN 101 7785 218th St W | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Market Street Parking Lot 20810 Holyoke Ave | DIRT_ROAD | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| Arts Center Parking Lot 20960 Holyoke Ave | DIRT_ROAD | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| City Hall -20195 Holyoke Ave 20195 Holyoke Ave | DIRT_ROAD | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| Heritage Center 20110 Holyoke Ave | DIRT_ROAD | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| Ames Hockey Arena 19900 Ipava Ave | DIRT_ROAD | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| HY VEE LAKEVILLE SOUTH 16150 Pilot Knob Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| DAKOTA COUNTY HERITAGE 01 20085 Heritage Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Lakeville?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Lakeville
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.