MN / Mankato
MN · EV charging
EV charging in Mankato, MN
Here is what NREL's public data shows about EV charging in Mankato, MN. As of NREL AFDC data retrieved September 2026, Mankato has 14 public charging stations with 21 Level 2 ports, including 8 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 14Public stations
- 21Level 2 ports
- 8DC fast ports
- 28%Ports that are DC fast
⚡ 3 stations list free charging
Stations are operated across 4 networks: ChargePoint Network (6), Tesla Destination (3), Blink Network (3), EV Connect (2).
Connectors on record: J1772 (Level 2) at 9 stations; CCS (J1772 Combo) at 4 stations; NACS / Tesla at 3 stations; CHAdeMO at 1 station.
Of these stations, 3 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 11. Always confirm current pricing with the network before you charge.
3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Mankato has 14 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Snell Indoor Auto Center 1900 Madison Ave | EV Connect | DC fast 3 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | September 2026 |
| Harrison Ford of Mankato - DCFC 1935 Madison Avenue | Blink Network | DC fast 2 DC fast · CCS (J1772 Combo) | September 2026 |
| Xcel Energy - Mankato, MN 3010 Adam St | EV Connect | DC fast 2 DC fast · CCS (J1772 Combo) | September 2026 |
| HYUNDAI MANKATO DC FAST 1 1281 Raintree Rd | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | September 2026 |
| Courtyard By Marriott Hotel & Event Center - Tesla Destination 901 Raintree Rd | Tesla Destination | 3 Level 2 · NACS / Tesla | August 2026 |
| Luther Mankato Honda 308 Raintree Road | Blink Network | 3 Level 2 · J1772 (Level 2) | September 2026 |
| MINNESOTA STATE LOT 11A - 2 West Road - Lot 11A | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | September 2026 |
| MINNESOTA STATE LOT 11A - 1 West Road - Lot 11A | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | September 2026 |
| Harrison Ford of Mankato - Level2 1935 Madison Avenue | Blink Network | 2 Level 2 · J1772 (Level 2) | September 2026 |
| WHITEKNIGHT EAST HEIGHTS 1 125 Roosevelt Cir | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | September 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Mankato?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Mankato
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved September 2026. Public stations only.