MN / Maplewood
MN · EV charging
EV charging in Maplewood, MN
Here is what NREL's public data shows about EV charging in Maplewood, MN. As of NREL AFDC data retrieved July 2026, Maplewood has 28 public charging stations with 52 Level 2 ports, including 3 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 28Public stations
- 52Level 2 ports
- 3DC fast ports
- 5%Ports that are DC fast
Stations are operated across 4 networks: ChargePoint Network (25), Non-networked (1), EV Connect (1), ZEFNET (1).
Connectors on record: J1772 (Level 2) at 27 stations; CHAdeMO at 2 stations; CCS (J1772 Combo) at 1 station.
Notable charging stations
The largest sites by port count, DC fast first. Maplewood has 28 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Schmelz Countryside Volkswagen 1180 Minnesota 36 | ZEFNET | DC fast 2 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Kline Nissan 3090 N Highway 61 | Non-networked | DC fast 1 DC fast + 2 Level 2 · CHAdeMO, J1772 (Level 2) | ⚠ February 2024 |
| 3M 280 STATION #4 2261 Conway Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| 3M 280 STATION #3 2261 Conway Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| 3M 236 STATION #6 240 Avenue K | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| 3M 220 GUEST #2 2501 Hudson Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| 3M 278 GUEST PARK 2350 Minnehaha Ave E | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| 3M 229 NORTHLOT #3 288 12th St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| 3M 229 NORTHLOT #5 288 12th St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| 3M 229 NORTHLOT #2 288 12th St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 1 of Maplewood's 28 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Maplewood?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Maplewood
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.