MN / St. Cloud
MN · EV charging
EV charging in St. Cloud, MN
Here is what NREL's public data shows about EV charging in St. Cloud, MN. As of NREL AFDC data retrieved July 2026, St. Cloud has 8 public charging stations with 4 Level 2 ports, including 19 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 8Public stations
- 4Level 2 ports
- 19DC fast ports
- 83%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 6 networks: Blink Network (2), FORD_CHARGE (2), Non-networked (1), EV Connect (1), and 2 more.
Connectors on record: CCS (J1772 Combo) at 6 stations; J1772 (Level 2) at 3 stations; CHAdeMO at 1 station; NACS / Tesla at 1 station.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 7. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. St. Cloud has 8 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| CircleK - St Cloud 4255 Roosevelt Rd | CIRCLE_K | DC fast 4 DC fast · CCS (J1772 Combo) | May 2025 |
| Tenvoorde Ford 185 Roosevelt Rd | FORD_CHARGE | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| Stearns History Museum 235 33rd Avenue South | Blink Network | DC fast 4 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| Gilleland Chevrolet Cadillac 3019 Division St | EV Connect | DC fast 3 DC fast · CCS (J1772 Combo) | July 2026 |
| City Of Saint Cloud 501 1st Street North | ZEFNET | DC fast 2 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| Miller Lincoln 2930 2nd St S | FORD_CHARGE | DC fast 2 DC fast · CCS (J1772 Combo) | July 2026 |
| St. Cloud City Hall 7th Street South | Blink Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Miller Nissan 2930 2nd St S | Non-networked | 1 Level 2 · J1772 (Level 2) | ⚠ February 2024 |
⚠ 1 of St. Cloud's 8 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in St. Cloud?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near St. Cloud
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.