MO / Clayton
MO · EV charging
EV charging in Clayton, MO
Here is what NREL's public data shows about EV charging in Clayton, MO. As of NREL AFDC data retrieved July 2026, Clayton has 18 public charging stations with 36 Level 2 ports, all Level 2 (no DC fast charging on record).
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 18Public stations
- 36Level 2 ports
- 0DC fast ports
- 0%Ports that are DC fast
Stations are operated across 1 network: ChargePoint Network (18).
Connectors on record: J1772 (Level 2) at 18 stations.
Notable charging stations
The largest sites by port count, DC fast first. Clayton has 18 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| STLOUISCOUNTY STATION 1 105 S Central Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| FORSYTH POINTE BP1 NORTH 8001 8027 Forsyth Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| FORSYTH POINTE P3 SE 8001 FORS 8027 Forsyth Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| FORSYTH POINTE P5 SE 8001 FORS 8027 Forsyth Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| FORSYTH POINTE P4 SE 8001 FORS 8027 Forsyth Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| FORSYTH POINTE P1 SOUTH 8027 8027 Forsyth Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| FORSYTH POINTE P1 NORTH 8027 8027 Forsyth Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| FORSYTH POINTE P5 SW 8027 FORS 8027 Forsyth Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| FORSYTH POINTE P2 NORTH 8027 8027 Forsyth Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| FORSYTH POINTE P4 SW 8027 FORS 8027 Forsyth Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Clayton?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Clayton
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.