ChargingAtlas

MO / Jefferson City

MO · EV charging

EV charging in Jefferson City, MO

Here is what NREL's public data shows about EV charging in Jefferson City, MO. As of NREL AFDC data retrieved September 2026, Jefferson City has 11 public charging stations with 14 Level 2 ports, including 26 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 1 station lists free charging

Stations are operated across 7 networks: ChargePoint Network (5), Non-networked (1), EV Connect (1), Tesla Destination (1), and 3 more.

Connectors on record: CCS (J1772 Combo) at 5 stations; J1772 (Level 2) at 4 stations; NACS / Tesla at 4 stations; CHAdeMO at 3 stations.

Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 10. Always confirm current pricing with the network before you charge.

4 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Jefferson City has 11 public stations in all — see the map above.

StationNetworkChargingConfirmed
Jefferson City, MO - Tesla Supercharger
735 W Stadium Blvd
Tesla DC fast 16 DC fast · NACS / Tesla June 2026
Joe Machens Capital City Ford
807 Southwest Blvd.
SYNERGEV DC fast 4 DC fast + 5 Level 2 · J1772 (Level 2), CCS (J1772 Combo) September 2026
Rusty Drewing Chevrolet Buick GMC Cadillac
2033 Christy Dr.
EV Connect DC fast 2 DC fast · CCS (J1772 Combo) September 2026
H3 QOZB MARRIOTTJC DC2
610 Bolivar
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) September 2026
H3 QOZB MARRIOTTJC DC1
610 Bolivar
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) September 2026
CENTRAL BANK 01-CTB MOTOR A
500 Madison st
ChargePoint Network DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla September 2026
CENTRAL BANK 01-CTB MOTOR B
500 Madison st
ChargePoint Network DC fast 1 DC fast · CHAdeMO, NACS / Tesla September 2026
Jefferson City
2505 Mission Drive
NOODOE 4 Level 2 · J1772 (Level 2) September 2026
H3 QOZB MARRIOTTJC L2
610 Bolivar
ChargePoint Network 2 Level 2 · J1772 (Level 2) September 2026
Culver's of Jefferson City - Tesla Destination
1920 Jefferson St
Tesla Destination 2 Level 2 · NACS / Tesla August 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Jefferson City?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Jefferson City

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved September 2026. Public stations only.