MO / North Kansas City
MO · EV charging
EV charging in North Kansas City, MO
Here is what NREL's public data shows about EV charging in North Kansas City, MO. As of NREL AFDC data retrieved July 2026, North Kansas City has 16 public charging stations with 39 Level 2 ports, all Level 2 (no DC fast charging on record).
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 16Public stations
- 39Level 2 ports
- 0DC fast ports
- 0%Ports that are DC fast
Stations are operated across 4 networks: ChargePoint Network (13), Tesla Destination (1), Non-networked (1), CHARGELAB (1).
Connectors on record: J1772 (Level 2) at 16 stations; NACS / Tesla at 1 station.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. North Kansas City has 16 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Harrah's Kansas City 1 Riverboat Dr | Non-networked | 6 Level 2 · J1772 (Level 2) | May 2025 |
| ORA - One North 1801 Diamond Parkway | CHARGELAB | 5 Level 2 · J1772 (Level 2) | July 2026 |
| EVERGY @BLDRASSOC-028A 105 W 12th Ave @ Builders Assoc of Mo | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| EVERGY @MAX ARMOR-265B 104 Armour Rd @ Maxus Armor Apartments | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| EVERGY @NKC HOSP -280A 2598 Clay Edwards Dr @ North Kansas City Hosp | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| EVERGY @NKC HOSP -281A 2897 Clay Edwards Dr @ North Kansas City Hosp | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| EVERGY @MACKN PRK-333A 1200 Clark Ferguson Dr @ Macken Park | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| EVERGY @NKC HOSP -280B 2598 Clay Edwards Dr @ North Kansas City Hosp | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| EVERGY @BLDRASSOC-028B 105 W 12th Ave @ Builders Assoc of Mo | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| EVERGY @MAX ARMOR-265A 104 Armour Rd @ Maxus Armor Apartments | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 1 of North Kansas City's 16 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in North Kansas City?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near North Kansas City
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.