ChargingAtlas

MS / Starkville

MS · EV charging

EV charging in Starkville, MS

Here is what NREL's public data shows about EV charging in Starkville, MS. As of NREL AFDC data retrieved July 2026, Starkville has 10 public charging stations with 20 Level 2 ports, including 2 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 1 station lists free charging

Stations are operated across 4 networks: ChargePoint Network (6), Tesla Destination (2), Non-networked (1), ENVIROSPARK (1).

Connectors on record: J1772 (Level 2) at 8 stations; NACS / Tesla at 3 stations; CCS (J1772 Combo) at 2 stations; CHAdeMO at 1 station.

Of these stations, 1 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 8. Always confirm current pricing with the network before you charge.

3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Starkville has 10 public stations in all — see the map above.

StationNetworkChargingConfirmed
STARKVILLE UTIL STATION 1 (L)
201 East Lampkin Street
ChargePoint Network DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla July 2026
STARKVILLE UTIL STATION 2 (R)
201 East Lampkin Street
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
Comfort Suites Starkville - Tesla Destination
801 Russell St
Tesla Destination 4 Level 2 · J1772 (Level 2), NACS / Tesla ⚠ July 2024
Hampton Inn - Starkville
700 Mississippi 12
ENVIROSPARK 4 Level 2 · J1772 (Level 2) November 2025
Hampton Inn Starkville - Tesla Destination
700 MS-12
Tesla Destination 3 Level 2 · J1772 (Level 2), NACS / Tesla ⚠ July 2024
STARKVILLE UTIL STARKVILLE REC
405 Lynn Ln
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
STARKVILLE UTIL STARKVILLE DWTN
135 Jefferson St
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
THE VISTA TVS #1
705 University Drive
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
THE VISTA TVS #2
705 University Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
Mississippi State University - Center for Advanced Vehicular Systems
200 Research Blvd
Non-networked 1 Level 2 · J1772 (Level 2) July 2026

⚠ 2 of Starkville's 10 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Starkville?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Starkville

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.