MS / Starkville
MS · EV charging
EV charging in Starkville, MS
Here is what NREL's public data shows about EV charging in Starkville, MS. As of NREL AFDC data retrieved July 2026, Starkville has 10 public charging stations with 20 Level 2 ports, including 2 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 10Public stations
- 20Level 2 ports
- 2DC fast ports
- 9%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 4 networks: ChargePoint Network (6), Tesla Destination (2), Non-networked (1), ENVIROSPARK (1).
Connectors on record: J1772 (Level 2) at 8 stations; NACS / Tesla at 3 stations; CCS (J1772 Combo) at 2 stations; CHAdeMO at 1 station.
Of these stations, 1 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 8. Always confirm current pricing with the network before you charge.
3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Starkville has 10 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| STARKVILLE UTIL STATION 1 (L) 201 East Lampkin Street | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| STARKVILLE UTIL STATION 2 (R) 201 East Lampkin Street | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Comfort Suites Starkville - Tesla Destination 801 Russell St | Tesla Destination | 4 Level 2 · J1772 (Level 2), NACS / Tesla | ⚠ July 2024 |
| Hampton Inn - Starkville 700 Mississippi 12 | ENVIROSPARK | 4 Level 2 · J1772 (Level 2) | November 2025 |
| Hampton Inn Starkville - Tesla Destination 700 MS-12 | Tesla Destination | 3 Level 2 · J1772 (Level 2), NACS / Tesla | ⚠ July 2024 |
| STARKVILLE UTIL STARKVILLE REC 405 Lynn Ln | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| STARKVILLE UTIL STARKVILLE DWTN 135 Jefferson St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| THE VISTA TVS #1 705 University Drive | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| THE VISTA TVS #2 705 University Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Mississippi State University - Center for Advanced Vehicular Systems 200 Research Blvd | Non-networked | 1 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 2 of Starkville's 10 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Starkville?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Starkville
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.