NC / Asheboro
NC · EV charging
EV charging in Asheboro, NC
Here is what NREL's public data shows about EV charging in Asheboro, NC. As of NREL AFDC data retrieved July 2026, Asheboro has 13 public charging stations with 21 Level 2 ports, including 3 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 13Public stations
- 21Level 2 ports
- 3DC fast ports
- 13%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 4 networks: ChargePoint Network (10), Non-networked (1), Blink Network (1), EV Connect (1).
Connectors on record: J1772 (Level 2) at 11 stations; CHAdeMO at 2 stations; CCS (J1772 Combo) at 2 stations.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 12. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Asheboro has 13 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| City of Asheboro Library 201 Worth St | EV Connect | DC fast 2 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| REVUP1 MCDONALDS ASHBO 1415 E Dixie Dr | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Asheboro Nissan 1635 E Dixie Dr | Non-networked | 2 Level 2 · J1772 (Level 2) | January 2026 |
| REVUP1 NC ZOO2 Zoo Pkwy | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| REVUP1 SOLAR POINT 1 4401 Zoo Parkway | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| REVUP1 SOLAR POINT 2 Zoo Pkwy | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| REVUP1 NC ZOO1 Zoo Pkwy | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| ASHEBORO CITY CITY HALL NORTH 146 N Church St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| ASHEBORO CITY CITY HALL SOUTH 146 N Church St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| REVUP5 PORT78 4401 Zoo Parkway | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Asheboro?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Asheboro
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.