ND / West Fargo
ND · EV charging
EV charging in West Fargo, ND
Here is what NREL's public data shows about EV charging in West Fargo, ND. As of NREL AFDC data retrieved July 2026, West Fargo has 8 public charging stations with 16 Level 2 ports, including 7 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 8Public stations
- 16Level 2 ports
- 7DC fast ports
- 30%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 3 networks: ChargePoint Network (4), Non-networked (3), Electrify America (1).
Connectors on record: J1772 (Level 2) at 6 stations; CCS (J1772 Combo) at 2 stations; NACS / Tesla at 1 station.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 7. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. West Fargo has 8 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Menards West Fargo 3036 (West Fargo, ND) 1300 13th Ave E | Electrify America | DC fast 6 DC fast · CCS (J1772 Combo) | July 2026 |
| CCEC CHARGERS HORNBACHERS 2050 Sheyenne St | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| The Lights-Parking Garage 520 32nd Ave W | Non-networked | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Vance Thompson Vision 354 23rd Ave E | Non-networked | 4 Level 2 · J1772 (Level 2) | ⚠ July 2024 |
| Hornbacher's 2050 Sheyenne St | Non-networked | 2 Level 2 · J1772 (Level 2) | July 2025 |
| ELEMENT FARGO BUILDING WEST 925 19th Ave E | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| ELEMENT FARGO NORTH 925 19th Ave E | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| ELEMENT FARGO SOUTH 925 19th Ave E | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 1 of West Fargo's 8 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in West Fargo?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near West Fargo
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.