NE / Omaha
NE · EV charging
EV charging in Omaha, NE
Here is what NREL's public data shows about EV charging in Omaha, NE. As of NREL AFDC data retrieved July 2026, Omaha has 90 public charging stations with 165 Level 2 ports, including 55 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 90Public stations
- 165Level 2 ports
- 55DC fast ports
- 25%Ports that are DC fast
⚡ 2 stations list free charging
Stations are operated across 10 networks: ChargePoint Network (70), Tesla Destination (6), Blink Network (3), WALMART (3), and 6 more.
Connectors on record: J1772 (Level 2) at 74 stations; CCS (J1772 Combo) at 12 stations; NACS / Tesla at 11 stations; CHAdeMO at 6 stations.
Of these stations, 2 list free charging and 4 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 84. Always confirm current pricing with the network before you charge.
11 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Omaha has 90 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Omaha, NE - Tesla Supercharger 8809 W Center Rd | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| Walmart EV Charging 16960 W Maple Rd | WALMART | DC fast 8 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| Walmart EV Charging 18201 Wright St | WALMART | DC fast 8 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| Walmart EV Charging 6304 N 99Th St | WALMART | DC fast 8 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| Target T1777 (Omaha, NE) 17810 W Center Rd | Electrify America | DC fast 6 DC fast · CCS (J1772 Combo) | July 2026 |
| Westwood Plaza 12125 W Center Rd | eVgo Network | DC fast 6 DC fast · CCS (J1772 Combo) | July 2026 |
| DEFIANCE H-D DCFAST HOG 4940 S 72nd St | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| CITY OF LAVISTA CABELAS 1 12501 Westport Pkwy | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| OMAHA OMAHA ILOT 3-1 1703 Chicago St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| MCC SOC AUTO BLDG 2900 Edward Babe Gomez Ave | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
⚠ 9 of Omaha's 90 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Omaha?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Omaha
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.