NJ / Cherry Hill
NJ · EV charging
EV charging in Cherry Hill, NJ
Here is what NREL's public data shows about EV charging in Cherry Hill, NJ. As of NREL AFDC data retrieved July 2026, Cherry Hill has 15 public charging stations with 21 Level 2 ports, including 33 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 15Public stations
- 21Level 2 ports
- 33DC fast ports
- 61%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 6 networks: ChargePoint Network (10), Electrify America (1), Blink Network (1), Tesla (1), and 2 more.
Connectors on record: J1772 (Level 2) at 11 stations; CCS (J1772 Combo) at 5 stations; NACS / Tesla at 3 stations; CHAdeMO at 1 station.
Of these stations, 1 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 13. Always confirm current pricing with the network before you charge.
3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Cherry Hill has 15 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Cherry Hill, NJ - Haddonfield Road - Tesla Supercharger 904 Haddonfield Road | Tesla | DC fast 8 DC fast · CCS (J1772 Combo), NACS / Tesla | June 2026 |
| Walt Whitman Service Plaza 700 NJ Turnpike | APPLEGREEN | DC fast 8 DC fast · CCS (J1772 Combo) | March 2026 |
| Cherry Hill, NJ Rechargery @ Wawa - Marlton Pike East 1824 Marlton Pike E | IONNA | DC fast 8 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| DoubleTree by Hilton - Cherry Hill 2349 Marlton Pike West | Blink Network | DC fast 6 DC fast · CHAdeMO, CCS (J1772 Combo), NACS / Tesla | July 2026 |
| Target T1085 (Cherry Hill, NJ) 2137 NJ-38 | Electrify America | DC fast 3 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| CHMB STATION 1 2151 Rte 70 W | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| CHMB STATION 2 2151 Rte 70 W | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| CHMB STATION 3 2151 Rte 70 W | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| CHMB STATION 5 2151 Rte 70 W | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| CHMB STATION 4 2151 Rte 70 W | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Cherry Hill?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Cherry Hill
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.