NJ / Edison
NJ · EV charging
EV charging in Edison, NJ
Here is what NREL's public data shows about EV charging in Edison, NJ. As of NREL AFDC data retrieved July 2026, Edison has 31 public charging stations with 57 Level 2 ports, including 34 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 31Public stations
- 57Level 2 ports
- 34DC fast ports
- 37%Ports that are DC fast
Stations are operated across 6 networks: ChargePoint Network (25), Tesla (2), OpConnect (1), LOOP (1), and 2 more.
Connectors on record: J1772 (Level 2) at 28 stations; NACS / Tesla at 2 stations; CCS (J1772 Combo) at 2 stations.
Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 30. Always confirm current pricing with the network before you charge.
2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Edison has 31 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Edison, NJ - Tesla Supercharger 55 Parsonage Rd. | Tesla | DC fast 16 DC fast · NACS / Tesla | June 2026 |
| Milbrook Edison Mall (Edison, NJ) 765-775 US-1 S | Electrify America | DC fast 10 DC fast · CCS (J1772 Combo) | July 2026 |
| Edison, NJ - U.S. Route 1 - Tesla Supercharger 580 U.S. Route 1 | Tesla | DC fast 8 DC fast · CCS (J1772 Combo), NACS / Tesla | June 2026 |
| Supercharged Entertainment 987 US 1 | LOOP | 11 Level 2 · J1772 (Level 2) | July 2026 |
| 687 Rt 1 687 Rt 1 | VIALYNK | 6 Level 2 · J1772 (Level 2) | July 2026 |
| Garden Homes - Millbrook Village North Sunrise Drive | OpConnect | 4 Level 2 · J1772 (Level 2) | July 2026 |
| HOMEWOODEWRWO STATION 1 100 Parsonage Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| EDISON 27 BROAD EDISON #2 2147 NJ-27 | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| EDISON 27 BROAD EDISON #1 2147 Lincoln Hwy | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| OR VOLVO STATION 3 731 US-1 | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Edison?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Edison
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.