NJ / Hainesport
NJ · EV charging
EV charging in Hainesport, NJ
Here is what NREL's public data shows about EV charging in Hainesport, NJ. As of NREL AFDC data retrieved October 2026, Hainesport has 20 public charging stations with 20 Level 2 ports, all Level 2 (no DC fast charging on record).
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 20Public stations
- 20Level 2 ports
- 0DC fast ports
- 0%Ports that are DC fast
Stations are operated across 1 network: ChargePoint Network (20).
Connectors on record: J1772 (Level 2) at 20 stations.
How Hainesport compares
We only compute a per-resident rate where NREL's city name lines up with one Census city. Hainesport doesn't: it may be a neighborhood or unincorporated area, or a city whose stations NREL files partly under borough or neighborhood names. Statewide, New Jersey has 2.2 public stations and 2.3 DC fast ports per 10,000 residents.
Last verified: NREL confirmed 100% of Hainesport's stations in the 12 months before this snapshot, most recently in October 2026.
Notable charging stations
The largest sites by port count, DC fast first. Hainesport has 20 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| HAINESPORT EV EV5 2835 Creek Rd | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
| HAINESPORT EV EV3 2835 Creek Rd | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
| HAINESPORT EV EV14 2835 Creek Rd | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
| HAINESPORT EV EV16 2835 Creek Rd | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
| HAINESPORT EV EV18 2835 Creek Rd | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
| HAINESPORT EV EV13 2835 Creek Rd | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
| HAINESPORT EV EV12 2835 Creek Rd | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
| HAINESPORT EV EV17 2835 Creek Rd | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
| HAINESPORT EV EV11 2835 Creek Rd | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
| HAINESPORT EV EV10 2835 Creek Rd | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Hainesport?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Hainesport
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.