NJ / Ridgewood
NJ · EV charging
EV charging in Ridgewood, NJ
Here is what NREL's public data shows about EV charging in Ridgewood, NJ. As of NREL AFDC data retrieved July 2026, Ridgewood has 7 public charging stations with 27 Level 2 ports, all Level 2 (no DC fast charging on record).
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 7Public stations
- 27Level 2 ports
- 0DC fast ports
- 0%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 5 networks: ChargePoint Network (2), EVOKE (2), Non-networked (1), OpConnect (1), and 1 more.
Connectors on record: J1772 (Level 2) at 7 stations.
Of these stations, 1 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 5. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Ridgewood has 7 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| The Benjamin - Parking Lot 1 Franklin Ave | EVOKE | 6 Level 2 · J1772 (Level 2) | June 2026 |
| Hudson Street Parking Garage 25 Hudson St | Non-networked | 5 Level 2 · J1772 (Level 2) | ⚠ December 2024 |
| Garden Homes - The Dayton 150 South Broad Street | OpConnect | 4 Level 2 · J1772 (Level 2) | July 2026 |
| The NoMa - NOMA Garage 45 N Maple Ave | EVOKE | 4 Level 2 · J1772 (Level 2) | June 2026 |
| Heritage Arms Condominium Association 364 Ridgewood Ave | CHARGELAB | 4 Level 2 · J1772 (Level 2) | July 2026 |
| CHESTNUTVIL CHESTNUT 2 168 Chestnut St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| CHESTNUTVIL CHESTNUT 1 168 Chestnut St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 1 of Ridgewood's 7 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Ridgewood?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Ridgewood
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.