ChargingAtlas

NY / Farmingdale

NY · EV charging

EV charging in Farmingdale, NY

Here is what NREL's public data shows about EV charging in Farmingdale, NY. As of NREL AFDC data retrieved July 2026, Farmingdale has 9 public charging stations with 27 Level 2 ports, all Level 2 (no DC fast charging on record).

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 1 station lists free charging

Stations are operated across 5 networks: ChargePoint Network (5), EV Connect (1), FLO (1), SWTCH (1), and 1 more.

Connectors on record: J1772 (Level 2) at 9 stations.

Of these stations, 1 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 7. Always confirm current pricing with the network before you charge.

Notable charging stations

The largest sites by port count, DC fast first. Farmingdale has 9 public stations in all — see the map above.

StationNetworkChargingConfirmed
Municipal Parking Lot 3 - Parking Lot 3
8 Cornelia St
EVOKE 7 Level 2 · J1772 (Level 2) June 2026
Adventureland
2245 Broadhollow Rd
FLO 4 Level 2 · J1772 (Level 2) July 2026
SWTCH Energy
2350 BRdhollow Rd
SWTCH 4 Level 2 · J1772 (Level 2) January 2026
Bethpage State Park
99 Quaker Meeting House Rd.
EV Connect 2 Level 2 · J1772 (Level 2) July 2026
COURTYARD REPUB STATION 2
2 Marriott Plaza
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
COURTYARD REPUB STATION 1
2 Marriott Plaza
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
TOWNEPLACE11735 TOWNE PLACE 1
1 Marriott Plaza
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
TOWNEPLACE11735 TOWNE PLACE 2
1 Marriott Plaza
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
STOLER STOLER LEXUS
2090 Broadhollow Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Farmingdale?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Farmingdale

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.