NY / Fayetteville
NY · EV charging
EV charging in Fayetteville, NY
Here is what NREL's public data shows about EV charging in Fayetteville, NY. As of NREL AFDC data retrieved July 2026, Fayetteville has 14 public charging stations with 43 Level 2 ports, including 10 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 14Public stations
- 43Level 2 ports
- 10DC fast ports
- 19%Ports that are DC fast
Stations are operated across 6 networks: ChargePoint Network (6), VIALYNK (3), RED_E (2), EV Connect (1), and 2 more.
Connectors on record: J1772 (Level 2) at 13 stations; CCS (J1772 Combo) at 3 stations; CHAdeMO at 2 stations.
Notable charging stations
The largest sites by port count, DC fast first. Fayetteville has 14 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Romano Ford 5431 N Burdick St | FORD_CHARGE | DC fast 6 DC fast · CCS (J1772 Combo) | July 2026 |
| Romano Ford Volkswagen 5431 N Burdick St | RED_E | DC fast 2 DC fast + 4 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| Romano Mercedes Benz of Syracuse 5433 N Burdick St | RED_E | DC fast 2 DC fast + 4 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| Fayetteville Pines 550 Warren St | VIALYNK | 10 Level 2 · J1772 (Level 2) | July 2026 |
| Town Center Fayetteville 540 Towne Dr | VIALYNK | 6 Level 2 · J1772 (Level 2) | July 2026 |
| Craftsman Inn 7300 E. Genesee St. | VIALYNK | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Green Lakes State Park 7900 Green lakes Rd | EV Connect | 2 Level 2 · J1772 (Level 2) | July 2026 |
| FAYETTEVILLE FAYETTEVILLE 205 Brooklea Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| FAYETTVL LIBRAY ORCHARD 1 288 Orchard St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| FAYETTVL LIBRAY ORCHARD 2 288 Orchard St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Fayetteville?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Fayetteville
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.