NY / Garden City
NY · EV charging
EV charging in Garden City, NY
Here is what NREL's public data shows about EV charging in Garden City, NY. As of NREL AFDC data retrieved September 2026, Garden City has 24 public charging stations with 95 Level 2 ports, including 36 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 24Public stations
- 95Level 2 ports
- 36DC fast ports
- 27%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 9 networks: VIALYNK (9), ChargePoint Network (6), Tesla (2), CHARGELAB (2), and 5 more.
Connectors on record: J1772 (Level 2) at 21 stations; NACS / Tesla at 3 stations.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 23. Always confirm current pricing with the network before you charge.
3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Garden City has 24 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Garden City, NY - Tesla Supercharger 630 Old Country Road | Tesla | DC fast 20 DC fast · NACS / Tesla | June 2026 |
| Garden City, NY - Stewart Avenue - Tesla Supercharger 644 Stewart Ave | Tesla | DC fast 16 DC fast · NACS / Tesla | June 2026 |
| Nassau Community College - C Cluster Parking Lot East 5A 1 Education Dr | VIALYNK | 12 Level 2 · J1772 (Level 2) | September 2026 |
| Harmony Health Care Long Island 400 Oak Street Suite 104 | RED_E | 8 Level 2 · J1772 (Level 2) | September 2026 |
| 300 Garden City Plaza 300 Garden City Plaza | VIALYNK | 6 Level 2 · J1772 (Level 2) | September 2026 |
| 400 Garden City Plaza 200 Garden City Plaza | VIALYNK | 6 Level 2 · J1772 (Level 2) | September 2026 |
| Garden City Plaza 100 Garden City Plaza | VIALYNK | 6 Level 2 · J1772 (Level 2) | September 2026 |
| 200 GCP 200 Garden City Plaza | VIALYNK | 6 Level 2 · J1772 (Level 2) | September 2026 |
| GCP 300 Garden City Plaza | VIALYNK | 6 Level 2 · J1772 (Level 2) | September 2026 |
| 200 Garden City Plaza 200 Garden City Plaza | VIALYNK | 6 Level 2 · J1772 (Level 2) | September 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Garden City?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Garden City
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved September 2026. Public stations only.