NY / Kingston
NY · EV charging
EV charging in Kingston, NY
Here is what NREL's public data shows about EV charging in Kingston, NY. As of NREL AFDC data retrieved July 2026, Kingston has 52 public charging stations with 142 Level 2 ports, including 28 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 52Public stations
- 142Level 2 ports
- 28DC fast ports
- 16%Ports that are DC fast
Stations are operated across 12 networks: ChargePoint Network (33), VIALYNK (7), Tesla Destination (3), Tesla (1), and 8 more.
Connectors on record: J1772 (Level 2) at 44 stations; CCS (J1772 Combo) at 7 stations; NACS / Tesla at 4 stations; CHAdeMO at 2 stations.
4 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Kingston has 52 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Kingston, NY - Tesla Supercharger 640 Washington Ave. | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| Ulster County DSS Front Lot 1061 Development Court | VIALYNK | DC fast 4 DC fast + 6 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| EVolve NY Kingston 451 Washington Ave | Electrify America | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| Romeo Ford 128 NY-28 | FORD_CHARGE | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| HondoGO - Kingston, NY 1221 Ulster Ave | EVGATEWAY | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| Lia Honda Kingston 743 E Chester St | QUICKCHARGE | DC fast 2 DC fast + 8 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | ⚠ unknown |
| PRESHYUN PKG 1 768 E Chester St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| PRESHYUN PKG 2 768 E Chester St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Ulster County DSS Office 1 Development Court | VIALYNK | 14 Level 2 · J1772 (Level 2) | July 2026 |
| Ulster County Probation 733 Broadway | VIALYNK | 12 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 5 of Kingston's 52 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Kingston?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Kingston
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.