NY / Liverpool
NY · EV charging
EV charging in Liverpool, NY
Here is what NREL's public data shows about EV charging in Liverpool, NY. As of NREL AFDC data retrieved July 2026, Liverpool has 40 public charging stations with 203 Level 2 ports, including 20 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 40Public stations
- 203Level 2 ports
- 20DC fast ports
- 9%Ports that are DC fast
⚡ 3 stations list free charging
Stations are operated across 9 networks: VIALYNK (15), ChargePoint Network (11), QUICKCHARGE (5), Non-networked (3), and 5 more.
Connectors on record: J1772 (Level 2) at 34 stations; CCS (J1772 Combo) at 6 stations; NACS / Tesla at 3 stations.
Of these stations, 3 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 37. Always confirm current pricing with the network before you charge.
3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Liverpool has 40 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Syracuse, NY - Tesla Supercharger 441 Electronics Parkway | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| Barnes & Noble Liverpool 3956 NY-31 | eVgo Network | DC fast 6 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| Sharon Chevrolet (Outside) 3687 NY-31 | VIALYNK | DC fast 2 DC fast + 4 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| PANERA BREAD NY-31 01 3815 New York 31 | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| PANERA BREAD NY-31 02 3815 New York 31 | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| PANERA BREAD NY-31 03 3815 New York 31 | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| PANERA BREAD NY-31 04 3815 New York 31 | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| New York State Labor Management 1105 Vine St | OpConnect | 26 Level 2 · J1772 (Level 2) | July 2026 |
| Saddle Club Townhomes 1 Gallowgate Court | VIALYNK | 20 Level 2 · J1772 (Level 2) | July 2026 |
| Residences at Covered Bridge 850 Vine St. | VIALYNK | 12 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 8 of Liverpool's 40 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Liverpool?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Liverpool
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.