NY / New Hartford
NY · EV charging
EV charging in New Hartford, NY
Here is what NREL's public data shows about EV charging in New Hartford, NY. As of NREL AFDC data retrieved July 2026, New Hartford has 16 public charging stations with 88 Level 2 ports, all Level 2 (no DC fast charging on record).
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 16Public stations
- 88Level 2 ports
- 0DC fast ports
- 0%Ports that are DC fast
Stations are operated across 6 networks: ChargePoint Network (6), VIALYNK (3), Non-networked (3), CHARGESMART_EV (2), and 2 more.
Connectors on record: J1772 (Level 2) at 16 stations.
Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 15. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. New Hartford has 16 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Slocum-Dickson Medical Group 1729 Burrstone Rd | Non-networked | 14 Level 2 · J1772 (Level 2) | ⚠ May 2024 |
| Slocum Dickson EV Chargers 1729 Burrstone Rd | RED_E | 14 Level 2 · J1772 (Level 2) | July 2026 |
| Hampton Inn - New Hartford 201 Woods Park Drive | CHARGESMART_EV | 10 Level 2 · J1772 (Level 2) | July 2026 |
| TownePlace Suites New Hartford 4760 Clinton Road | CHARGESMART_EV | 10 Level 2 · J1772 (Level 2) | July 2026 |
| Tehan's Plaza - Red Lobster 4581 Commercial Drive | VIALYNK | 8 Level 2 · J1772 (Level 2) | July 2026 |
| Tehan's Plaza - Hannaford 4605 Commercial Drive | VIALYNK | 8 Level 2 · J1772 (Level 2) | July 2026 |
| Phaeton Motors 117 New Hartford St | VIALYNK | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Reaves Dental 4301 Middle Settlement Rd | Non-networked | 4 Level 2 · J1772 (Level 2) | ⚠ June 2024 |
| NEW HARTFORD GW-1 1.2 8635 Clinton St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| NEW HARTFORD GW-1 1.3 8635 Clinton St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 3 of New Hartford's 16 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in New Hartford?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near New Hartford
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.