ChargingAtlas

NY / New Hartford

NY · EV charging

EV charging in New Hartford, NY

Here is what NREL's public data shows about EV charging in New Hartford, NY. As of NREL AFDC data retrieved July 2026, New Hartford has 16 public charging stations with 88 Level 2 ports, all Level 2 (no DC fast charging on record).

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 6 networks: ChargePoint Network (6), VIALYNK (3), Non-networked (3), CHARGESMART_EV (2), and 2 more.

Connectors on record: J1772 (Level 2) at 16 stations.

Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 15. Always confirm current pricing with the network before you charge.

Notable charging stations

The largest sites by port count, DC fast first. New Hartford has 16 public stations in all — see the map above.

StationNetworkChargingConfirmed
Slocum-Dickson Medical Group
1729 Burrstone Rd
Non-networked 14 Level 2 · J1772 (Level 2) ⚠ May 2024
Slocum Dickson EV Chargers
1729 Burrstone Rd
RED_E 14 Level 2 · J1772 (Level 2) July 2026
Hampton Inn - New Hartford
201 Woods Park Drive
CHARGESMART_EV 10 Level 2 · J1772 (Level 2) July 2026
TownePlace Suites New Hartford
4760 Clinton Road
CHARGESMART_EV 10 Level 2 · J1772 (Level 2) July 2026
Tehan's Plaza - Red Lobster
4581 Commercial Drive
VIALYNK 8 Level 2 · J1772 (Level 2) July 2026
Tehan's Plaza - Hannaford
4605 Commercial Drive
VIALYNK 8 Level 2 · J1772 (Level 2) July 2026
Phaeton Motors
117 New Hartford St
VIALYNK 4 Level 2 · J1772 (Level 2) July 2026
Reaves Dental
4301 Middle Settlement Rd
Non-networked 4 Level 2 · J1772 (Level 2) ⚠ June 2024
NEW HARTFORD GW-1 1.2
8635 Clinton St
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
NEW HARTFORD GW-1 1.3
8635 Clinton St
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026

⚠ 3 of New Hartford's 16 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in New Hartford?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near New Hartford

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.