NY / Saratoga Springs
NY · EV charging
EV charging in Saratoga Springs, NY
Here is what NREL's public data shows about EV charging in Saratoga Springs, NY. As of NREL AFDC data retrieved July 2026, Saratoga Springs has 79 public charging stations with 189 Level 2 ports, including 8 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 79Public stations
- 189Level 2 ports
- 8DC fast ports
- 4%Ports that are DC fast
Stations are operated across 7 networks: ChargePoint Network (58), VIALYNK (7), QUICKCHARGE (5), CHARGESMART_EV (4), and 3 more.
Connectors on record: J1772 (Level 2) at 76 stations; NACS / Tesla at 3 stations; CCS (J1772 Combo) at 2 stations.
3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Saratoga Springs has 79 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Carrols Burger King #2086 (Saratoga Springs, NY) 3004 NY-50 | Electrify America | DC fast 6 DC fast · CCS (J1772 Combo) | July 2026 |
| Saratoga Honda 3402 US-9 | QUICKCHARGE | DC fast 2 DC fast + 2 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | ⚠ unknown |
| Skidmore College - North Hall 815 N Broadway | CHARGESMART_EV | 6 Level 2 · J1772 (Level 2) | July 2026 |
| Skidmore College - Hoge Hall 815 N Broadway | CHARGESMART_EV | 6 Level 2 · J1772 (Level 2) | July 2026 |
| Skidmore College - Jonsson Hall 815 N Broadway | CHARGESMART_EV | 6 Level 2 · J1772 (Level 2) | July 2026 |
| Saratoga Spa State Park - Administrator Building 15 Roosevelt Dr | VIALYNK | 6 Level 2 · J1772 (Level 2) | July 2026 |
| Munter - Soleno 66 Duplainville Rd | QUICKCHARGE | 6 Level 2 · J1772 (Level 2) | ⚠ unknown |
| The Hamlet 56 Marion Ave | VIALYNK | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Adelphi Hotel 39 Washington St | VIALYNK | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Saratoga National Bank 171 S Broadway | VIALYNK | 4 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 8 of Saratoga Springs's 79 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Saratoga Springs?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Saratoga Springs
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.