NY / Williamsville
NY · EV charging
EV charging in Williamsville, NY
Here is what NREL's public data shows about EV charging in Williamsville, NY. As of NREL AFDC data retrieved July 2026, Williamsville has 17 public charging stations with 79 Level 2 ports, including 8 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 17Public stations
- 79Level 2 ports
- 8DC fast ports
- 9%Ports that are DC fast
⚡ 2 stations list free charging
Stations are operated across 7 networks: ChargePoint Network (6), Blink Network (3), CHARGESMART_EV (3), EV Connect (2), and 3 more.
Connectors on record: J1772 (Level 2) at 14 stations; CCS (J1772 Combo) at 4 stations; CHAdeMO at 2 stations.
Of these stations, 2 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 15. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Williamsville has 17 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Dave Smith Ford 4045 Transit Rd | FORD_CHARGE | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| 2100 Wehrle Dr 2100 Wehrle Dr | EV Connect | DC fast 2 DC fast + 5 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| MB OF BUFFALO DC MERC BUFF 2 8185 Main St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| MB OF BUFFALO DC MERC BUFF 1 8175 Main St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| MT Amherst - Parking Lot 1100 Wehourle Dr | EVOKE | 20 Level 2 · J1772 (Level 2) | June 2026 |
| La Quinta Inn Williamsville 6619 Transit Rd | CHARGESMART_EV | 10 Level 2 · J1772 (Level 2) | July 2026 |
| Best Western Buffalo (Eva Hotel) 50 Freeman Rd | CHARGESMART_EV | 10 Level 2 · J1772 (Level 2) | July 2026 |
| Hawthorn Suites by Wyndham Williamsville 8005 Sheridan Dr | CHARGESMART_EV | 10 Level 2 · J1772 (Level 2) | July 2026 |
| The Pointe 6842 Main Street | Blink Network | 9 Level 2 · J1772 (Level 2) | July 2026 |
| MOSEY MOSEY 1 5195 Main St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 1 of Williamsville's 17 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Williamsville?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Williamsville
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.