OH / Bedford
OH · EV charging
EV charging in Bedford, OH
Here is what NREL's public data shows about EV charging in Bedford, OH. As of NREL AFDC data retrieved July 2026, Bedford has 7 public charging stations with 15 Level 2 ports, including 1 DC fast-charging port for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 7Public stations
- 15Level 2 ports
- 1DC fast ports
- 6%Ports that are DC fast
⚡ 2 stations list free charging
Stations are operated across 4 networks: Blink Network (3), ChargePoint Network (2), Non-networked (1), FLO (1).
Connectors on record: J1772 (Level 2) at 7 stations; CCS (J1772 Combo) at 1 station.
Of these stations, 2 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 5. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Bedford has 7 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Jay Honda 175 Broadway Avenue | Blink Network | DC fast 1 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| Hyundai of Bedford 18300 Rockside Road | Blink Network | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Kia of Bedford 18180 Rockside Road | Blink Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| CITY OF BEDFORD MUNI LOT 2 695 Broadway Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| CITY OF BEDFORD MUNI LOT 1 695 Broadway Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Audi Bedford 19400 Rockside Rd | Non-networked | 2 Level 2 · J1772 (Level 2) | ⚠ August 2024 |
| Bedford City Hall Parking Lot 165 Center Road | FLO | 2 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 1 of Bedford's 7 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Bedford?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Bedford
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.